Design and execution: Connection heating for zone S-E Brasov to the trasportation network of CET Nord Consumers' thermal energy metering in the town of Gura Humorului Modernization of heat and hot water supply system TS 71 (heat carrier distribution networks). Design of water and sewerage connections for buildings Building reuse in order to be changed into a social center in Botosani Implementation of the project for rehabilitation of district heating networks in Botosani - Rehabilitation of the district heating system in Botosani for the period 2009-2028 in order to comply with the environmental legislation and to improve energy efficiency. Rehabilitation of the primary heat carrier transport network in Botosani, corresponding to Item II-6, II-7, II-8 and II-9

2 of 105 t/h of CET Botosani - Rehabilitation of the district heating system in Botosani for the period 2009-2028 in order to comply with the environmental legislation and to improve energy efficiency. Demolition, disassembly of CAF 2, CAF 3 of 100 Gcal/h and Steam boilers no.

Rehabilitation and modernization of thermal substations and secondary heating networks, tele-tracking system, teletransmission and telemetering for housing complexes Teilor 1 and Eminescu 2, Botosani Rehabilitation of the primary heat carrier transport network in Botosani, design + construction & assembly Item I-5 and Item I-6 Rehabilitation and modernization of four Thermal Substations: Grivita 5, Grivita 6, Pacea 2, Bucovina – design and execution Heat supply in individual horizontal metering system to 8 blocks of flats in Botosani – design and execution Rehabilitation works of the transport and heat distribution system in Suceava – TS Obcini 4 and TS Zamca 4 interior installations Rehabilitation of the central area of Suceava - Works diverting the underground heating networks in the parking lot proposed on the esplanade near the fountain. Modernization of the transport and heat distribution system, corresponding to TS Cuza Voda 6, construction & assembly works without basic material procurement, Suceava Rehabilitation of heating systems, plumbing and metering installations, with basic material procurement, corresponding to Thermal Substation Obcini 1, Thermal Substation A4 Tipografie, Suceava Modernization of the transport and heat distribution system, corresponding to TS Obcini 1 and TS Zamca 5, construction & assembly works without basic material procurement, Suceava Enescu 4/3/1, construction & assembly works without basic material procurement, Suceava Modernization of the transport and heat distribution system, corresponding to TS G. 1) and Tudor Vladimirescu Thermal Substation (batch no. Rehabilitation of the district heating system in Suceava, corresponding to the Hotel Thermal Substation (batch no. Equipment of thermal substations with heat meters on the secondary circuits and pipe replacement, District 2, Package 5 2004 RO 16 P PE 001 – rehabilitation works of Tudor Vladimirescu Street

Rehabilitation works of water supply and sewage networks in Botosani, Romania, ISPA measure, no.

Installation works to the related district heating networks Batch 8 – TS 2 Canta, Iasi Rehabilitation of transport and thermal energy networks, TS Cuza Voda 3, Suceava Rehabilitation of three Thermal Substations: TS Intersectie Marasesti, TS Liliacul, TS Cuza Voda 3, Suceava Rehabilitation of transport and thermal energy networks, TS G. Rehabilitation of transport and thermal energy networks, TS 1 Mihai Viteazu, Suceava Rehabilitation and modernization works of heating networks, Grivita 4 district, Botosani Rehabilitation and modernization works of heating networks, Parcul Tineretului district, Botosani